
New TopShim run:

version = topshim 2.4.0
date = 2024-10-10
time = 19:17:46.246
command = topshim  convcomp tuneaxyz

FINE SHIMMING

Parameters:

probe = Z116098_0395
solvent = CDCl3
shim nucleus = 2H
nucleus optimised for = 13C
o1p (from lock) = 7.24 ppm

Results:


1D Shimming:
Iteration  1: FWHM Before= 8.6 Hz, Target= 0.5 Hz, After= 0.6 Hz
Iteration  2: FWHM Before= 0.6 Hz, Target= 0.5 Hz, After= 0.6 Hz
Iteration  3: FWHM Before= 0.6 Hz, Target= 0.5 Hz
Shim succeeded

Lineshape quality factor (1D spectrum, spinning) = 0.759


Performing tune after shimming
tune lock level increase = 1.4

shim changes: 
Z	-297
Z2	-1
Z3	-31
Z4	+231
Z5	-251
X	+138
Y	+138

duration = 2 min 34 sec
completed successfully
finished Thu Oct 10 19:20:18 2024


========================================================================
